Project Information
-
Client Name: Social Justice and Human Rights Centre
-
Property Type: Community Center
-
Project Duration: 1 Day
-
Service Area: The Foundry, 17 Oval Way, London
Recent Project
Remedial Works to Site Equipment
A local Social Justices and Human Rights Center contacted our team to resolve multiple repair issues affecting the safety, functionality, and appearance of their Air Conditioning system. The work included AC unit repairs, part replacements, and general maintenance tasks
Our technicians performed a full diagnosis, prioritized the required repairs, and delivered a complete maintenance solution within the scheduled time frame.
A client required a dependable team to address multiple maintenance concerns of their AC units. The project involved repairing damaged parts, improving functionality of AC units, and carrying out preventative maintenance to reduce future repair costs.
01. Project Challenges
The units had several unresolved maintenance problems that had accumulated over time and required replacement of multiple parts.
- Junction box identified with water ingress
- Corrosion of damper arms and other parts
- Worn out Humidifier Cylinder
- Worn out filters
02. Work Completed
Our experienced HVAC team developed a comprehensive maintenance strategy to resolve all identified issues efficiently, ensuring every repair was completed to the highest standard while minimizing disruption to the client.
Rooftop Extract AHU
- Isolated and made safe.
- Labelled and removed wiring at Junction box which has been identified earlier with water ingress.
- New junction box installed and wired accordingly.
- Cleaned all corrosion off damper arms and other parts
Rear Building Condensor Isolator Switch
- Isolator switch removed after wiring labelled.
- New Isolator Switch and new 20mm glands installed and wired as required
- Power Reinstated at circuit breaker and at Local Isolator Switch.
New Isolator Switch and new 20mm glands installed.
Basement COMMS Room AC Unit
- Drained down and removed Humidifier Cylinder after wiring all labelled.
- New Cylinder installed and wired as required.
- Removed all old filters from both ac units and renewed.
Labelled wiring for Chilled Water Actuator before removing.
Setup & Final Testing
- Test of Humidifier Cylinder and Actuator carried out via the Airedale Controller.
- Setpoints for temperature and Humidity adjusted.
- Observed Steam Cylinder activation.
- Fill valve operation and Steam production and current draw all within specifications.
03. Results Delivered
The completed work not only restored damaged areas but also improved the property’s safety, efficiency, and long-term value, providing the client with greater confidence and peace of mind.
- All identified problems items successfully fixed
- Improved operation of AC Units
- Actuator and valve operating as required
- Reduced future maintenance concerns